Skip to content
BackBoat AlmanacSign inAdd for free

Article

Wintering a yacht in Turkey: marinas, haul-out, costs, paperwork

Was it useful? Tap your stars:☆☆☆☆☆

19 min read

Published By Tuna Karslı, editorHow guides are checked

Turkey has become one of the most popular places in the Mediterranean to lay up a yacht for the winter. The coast between Istanbul and Antalya offers dozens of marinas with hardstands, travel lifts and resident contractors, the cruising season runs from April to late October, and the rules for foreign-flag private yachts allow a boat to stay in the country for years rather than months. For owners based in northern Europe it is also a practical base: most of the big marinas lie within an hour or two of an international airport.

This guide sets out what a foreign owner needs to know before signing a winter contract in Turkey: which marinas and yards are worth comparing, how the transit log and stay rules work, how tariffs are calculated and what to ask for in a quote, and a checklist of jobs to plan for the lay-up period. Facts and figures are taken from the marinas’ own websites and from regulatory and cruising sources named in the text; where a figure could not be verified it has been left out.

Why owners winter in Turkey

Three things draw owners to Turkey for the winter. The first is capacity. Marmaris alone has several large marinas and yards; the chair of the local chamber of shipping told Hurriyet Daily News in December 2025 that the town has the largest marina capacity in the Mediterranean, and that motor yachts of up to 350 tonnes are lifted there for winter maintenance. Didim, Göcek, Bodrum and Antalya all have yards with travel lifts of 75 tonnes or more.

The second is labour. Turkish yards have a long tradition of building and refitting gulets and, more recently, series-built motor yachts, so painters, fibreglass laminators, joiners, engine mechanics and upholsterers are available in most marina towns. Many marinas host independent contractors on site, which allows an owner to commission work while the boat is ashore and compare quotes from several firms.

The third is the regulatory framework. A foreign-flag private yacht can be kept in Turkey for up to five years, and the owner can fly home while the boat remains in a licensed marina. Those rules are explained in detail below, because misunderstanding them is the most common source of problems.

Comparing the main wintering centres

The table below summarises published facilities at a selection of marinas in each region. Figures are those stated on each operator’s website in October 2026; some sites give slightly different numbers on different pages, and where that happens the higher-level figure is shown and the discrepancy noted. Always confirm current lift capacity and hardstand availability directly, especially for catamarans and deep-keel yachts.

Region Marina or yard Sea berths Land storage Lifting equipment
Marmaris Netsel Marmaris Marina (Setur) 701 Lift and launch by marina; contractors on site Not stated online
Marmaris Albatros Marina Moorings on 78,000 m2 of water Dry standing on 30,000 m2 Not stated online
Göcek D-Marin Göcek 380-388 Dry dock for 150 boats on 18,000 m2, two winter repair hangars 75 t , 40 t trailer
Göcek Göcek Village Port (Setur) 220 200 boats on a 36,000 m2 haul-out area, two 750 m2 paint hangars 200 t and 75 t travel lifts, 40 t and 100 t boat movers
Bodrum D-Marin Turgutreis 532 150 boats on 10,000 m2, winter repair hangars 100 t travel lift, 40 t trailer
Bodrum Milta Bodrum Marina 425 50 land berths Haul-out service, specifications not stated
Didim D-Marin Didim 576-591, including superyacht berths Dry dock capacity quoted as 600 boats on about 70,000 m2 400 t and 75 t travel lifts
Kuşadası Setur Kuşadası Marina 428-557 (two figures published) 100-130 land spaces 120 t travel lift, up to 9.20 m
Antalya Setur Antalya Marina 198-235 150 boats, 900 m2 paint hangar 75 t and 200 t travel lifts
Istanbul Setur Kalamış and Fenerbahçe 1,278 220 boats Not stated online
Istanbul Ataköy Marina Up to 1,000 Land parking and slipway 63 t travel lift, 10 t mobile crane
Istanbul West Istanbul Marina 600 Dry dock for 300 boats, rack system for 96 Not stated online

Marmaris

Marmaris is the traditional wintering capital of the Turkish coast. The bay is well sheltered, the town has a large expatriate and community through the winter, and Dalaman airport is about 90 minutes by road. Netsel Marina sits in the town itself, which suits owners who want shops and restaurants within walking distance. Marmaris Yacht Marina lies across the bay, about 8 km by road and 2 nautical miles by sea from the centre according to its own website, and is primarily a hardstand and repair operation with a pool, chandlery and a free ferry to town. Albatros Marina offers dry standing on 30,000 m2 of land. Because of the concentration of contractors, Marmaris is often the first choice for owners planning substantial work such as treatment, a full repaint or teak deck replacement.

Göcek and Fethiye

Göcek sits at the head of a sheltered gulf with a dozen anchorages within a short motor, which makes it a good base for owners who want to use the boat in the shoulder months. It is also the closest wintering centre to Dalaman airport, roughly 20 minutes away. D-Marin Göcek has a 75 t lift and two repair hangars; Setur’s Göcek Village Port has the larger hardstand of the two, with 200 t and 75 t lifts and two paint hangars. Setur’s separate Göcek Exclusive Marina was established for yachts of 18 m and above and uses the Village Port yard for haul-out. Space ashore in Göcek is more limited than in Marmaris or Didim, so early booking matters.

Bodrum peninsula

The Bodrum peninsula has several large marinas and is well connected through Milas-Bodrum airport. D-Marin Turgutreis, on the western side of the peninsula, has a 100 t lift and covered repair hangars. Milta Bodrum Marina is in the town centre below the castle. Milta’s website explains that its fees follow a tariff approved by the Ministry of Culture and Tourism, that berthing is calculated on area (length multiplied by beam, with a minimum of 30 m2) and that 20 per cent VAT applies. That square-metre method is common across Turkish marinas and is worth understanding before comparing quotes.

Didim

D-Marin Didim is one of the largest yard operations on the Aegean coast. Its website lists a 400 t travel lift with an 11 m lifting pool, a second 75 t lift, a boatyard of about 70,000 m2 and a dry dock capacity of 600 boats, together with closed garages and storage bins. The town is quieter than Bodrum or Marmaris in winter, which some owners prefer, and the nearest airports are Bodrum and Izmir. Its size makes it a realistic option for large catamarans and superyachts that struggle to find hardstand space elsewhere.

Kuşadası

Setur Kuşadası Marina is close to Izmir Adnan Menderes airport and has a 120 t travel lift that can handle boats up to 9.20 m in beam, a useful figure for owners. Land storage is relatively limited at 100 to 130 places, depending on which page of the website you read, so the marina is better suited to owners planning to winter afloat or to a short lift-out for . Repair businesses on site cover engines, electronics, carpentry, upholstery and painting.

Antalya and the south coast

Setur Antalya Marina lies within the commercial port west of the city and has 75 t and 200 t lifts, space for 150 boats ashore and a 900 m2 paint hangar. The south coast has the mildest winter on the Turkish mainland, which makes painting and varnishing practical for longer, and Antalya airport has year-round flights to much of Europe. Further west, Setur also operates Finike, Kaş and Demre; the Demre facility lists land storage for 250 boats in Setur’s published FAQ.

Istanbul

Istanbul is a different proposition. Winters on the Sea of Marmara are colder, wetter and windier than on the Aegean and Mediterranean coasts, and southerly lodos gales can send a swell into exposed harbours. On the other hand, the city has an enormous boating market and some of the largest marinas in the country. Setur Kalamış and Fenerbahçe on the Asian side has 1,278 berths and space for 220 boats ashore. Ataköy Marina on the European side lists up to 1,000 berths and a 63 t travel lift. West Istanbul Marina near Beylikdüzü has 600 berths, dry dock space for 300 boats and a rack system for 96 smaller craft. Istanbul suits owners who plan to cruise the Marmara and the Black Sea approaches, or who want the boat close to the city.

Transit log and stay rules for foreign-flag yachts

The paperwork side of wintering in Turkey revolves around the transit log, formally the Yacht Registration Form. It is now applied for electronically, either by the owner or through an authorised agent. Every Setur marina says in its FAQ that it acts as an agent for transit log formalities, and most other large marinas offer the same service.

Obtaining the transit log

A foreign-flag yacht must enter Turkey at a designated port of entry. The Blue Guide’s summary of the Maritime Tourism Regulation lists more than 40 such harbours, including Istanbul, Izmir, Bodrum, Marmaris, Fethiye and Antalya. After the online application, the skipper or agent visits the harbour master and, as required, port health, passport police and customs; a barcoded transit log is issued once all have approved it. GocekOnline’s 2025 guide lists the documents normally required: the registration or ownership certificate, third-party liability insurance valid in Turkey, passports for everyone on board, the skipper’s certificate of competence, and a power of attorney if an agent applies. The same guide puts the document fee for a foreign-flag yacht at about EUR 70, with a further length-based charge, and warns that fees are revised each year.

Document checks have become stricter. In February 2026 the Spanish agency Interparus reported that, from 1 August 2025, Turkey’s Directorate of Maritime Transport had begun rejecting registration certificates with erasures, corrections or handwritten entries, including handwritten renewal dates. Jersey-flagged yachts were reported to need a machine-printed transcript of registry. Before sailing to Turkey for the winter, check that the original registration document is clean, current and issued by a state authority.

Validity and what cancels it

The transit log is valid for one year and is a single-entry document: if the yacht leaves Turkish waters, it must be surrendered and a new one obtained on return. According to the Blue Guide, it is also cancelled when the person who completed it is replaced, when new crew join, and when the owner or skipper leaves the yacht in a marina for laying up. Anyone on board who is not listed on the log is not permitted, and changes to crew or guests must be registered with the nearest harbour master.

How long the yacht can stay

Under the Maritime Tourism Regulation as summarised by the Blue Guide, a foreigner may leave a yacht in a licensed marina or boatyard for storage, maintenance or repair and leave the country. The yacht may stay in Turkey for up to five years, provided it sails from its harbour at least once every two years; the Ministry may extend the period after five years on application. The Teos Marina sailing guide published in 2022 gives the same five-year rule. In practice this means a boat can winter ashore, be launched each spring, and remain in Turkey for several seasons without leaving Turkish waters.

The owner’s own stay

The rules for the boat and the rules for the people on it are separate. Most visitors may stay in Turkey for 90 days in any 180-day period. Owners who want to spend longer, for example living aboard over the winter, need a short-term residence permit. The Teos Marina guide notes that permits are applied for through the official e-ikamet portal, that a Turkish address such as a marina contract is required, that the permit for boat owners is limited to the term of the marina contract, and that Turkish health insurance is required. It also recommends using an agent and taking a Turkish speaker to the appointment. Rules on residence permits change frequently, so check the current position with the marina office before relying on it.

Use of the boat by others

A foreign-flag private yacht that winters in Turkey may only be sailed in Turkish waters with the owner on board, according to the Blue Guide. For yachts in joint or club ownership, up to four named owners per year may sail it. Guests may be carried free of charge but not for any commercial purpose, and a private yacht may not be chartered between Turkish ports. Owners who plan to lend the boat to friends or family should take advice on how the log is completed.

How winter tariffs are built

Most Turkish marinas do not publish their tariffs online. Setur’s FAQ states that rates vary by marina, vessel size and services, that daily, monthly and annual rates differ, and that owners should contact each marina office; Ataköy’s price page simply asks visitors to contact the front office; D-Marin’s pages route enquiries through a booking form. Milta Bodrum, as noted above, sets out the method but not the rates. Any EUR figure you see quoted on forums for a particular marina should therefore be treated as one owner’s experience rather than a published price, and a written quote is essential.

Turkish marina prices are usually quoted in euros, although payment may be made in Turkish lira, euros or US dollars; Setur says it accepts all three and credit cards. VAT at 20 per cent is added to marina services, and a stamp tax is due on marina contracts, as Milta’s website notes. The table below shows the cost lines that typically appear on a winter quote and how they are usually calculated.

Cost line Usual basis What to clarify
Land storage Area (length overall x beam) per day or per contract period, often with a minimum area Is measured including bowsprit, davits and pulpit? Which months are covered?
Haul-out and launch Per lift, by length or weight band Is a single lift or a return lift-and-launch quoted? Is a pressure wash included?
Pressure wash Per metre or flat fee Is it included in the lift? Is antifouling residue collected?
Cradle or props Per period or included Own cradle or marina stands? Charge for storing your cradle in summer?
Mast unstepping and storage Crane hire plus storage per period Needed for your winter work? check included?
Electricity and water ashore Metered Rate per kWh; is shore power available on the hardstand?
Contractor access Some marinas charge outside contractors a daily fee Can you bring your own engineer, or must you use resident firms?
Extra days Daily area rate after the contract ends What happens if the launch slips because of weather or contractors?
VAT and stamp tax 20 per cent VAT on services; stamp tax on the contract Is the quote shown with or without VAT?
Transit log and agency Official fee plus agency fee Is the agency service included in the marina contract?

Afloat or ashore?

Many owners compare an annual berth with a winter-only package. An annual contract afloat often includes one or more free lift-outs, while a land-storage contract may cover a fixed period such as November to April. Storing ashore protects the hull from fouling and lets it dry, which matters if you plan moisture readings, blister repairs or a new antifouling system. Wintering afloat costs less in lifting fees, keeps systems running and avoids launch-date bottlenecks in April, but needs regular checks on mooring lines, bilge pumps and battery charge. In exposed harbours, and in Istanbul in particular, owners should ask how the marina handles storm conditions and whether staff will adjust lines.

Getting a comparable quote

Send every marina the same information: length overall including all overhangs, beam, draught, displacement, keel type, whether you need mast unstepping, the dates you expect to haul and launch, and any work you plan to commission. Ask for the quote in euros with VAT shown separately, and ask which contractors work on site. Compare not just the storage rate but the total for lift, wash, storage, power and launch, plus the rate for extra days.

Winter work checklist

The months ashore are the best opportunity for maintenance and upgrades. Book contractors early: in popular yards the best painters and engineers fill their diaries by November. The list below is organised by when the work is usually done.

Before hauling out

  • Run the engine to temperature, change oil and filter while the oil is warm, and note any leaks, smoke or alarms for the mechanic.
  • Pump out holding tanks and flush with fresh water.
  • Note any faults from the season in one list, with photographs, to hand to contractors.
  • Remove sails, canvas, cushions and loose gear that would suffer from damp or be attractive to thieves; most marinas rent storage units.
  • Agree with the yard where the boat will sit, how it will be supported and whether the mast stays up.
  • Photograph the hull, deck and interior so that you have a record of condition before the lift.

Immediately after the lift

  • Inspect the hull straight after pressure washing, when blisters, cracks around the keel joint and damage to the rudder are easiest to see.
  • Check anodes, shafts, P-brackets, cutlass bearings, saildrive seals and propellers.
  • Check through-hull fittings and seacocks for corrosion and free movement.
  • If moisture readings are planned, leave the hull to dry: a meaningful reading needs the boat out of the water and drying for at least a week, and longer after a long season afloat.
  • Check that the stands or cradle bear on structural points and that the boat is level enough for rainwater to drain from the cockpit and deck.

Engine and systems

  • Flush the raw water circuit with fresh water and, if the yard recommends it, run antifreeze through it; frosts are rare on the south coast but occur in Istanbul and inland.
  • Replace the raw water pump impeller and check the heat exchanger and exhaust elbow.
  • Change fuel filters and consider a fuel polish; fill tanks to reduce condensation.
  • Service the gearbox or saildrive oil.
  • Drain or winterise the freshwater system, water heater and watermaker according to the manufacturer’s instructions.
  • Charge batteries fully, then disconnect them or leave them on a correctly configured charger; check with the marina whether unattended shore power is allowed.

Rig, deck and safety

  • Have standing rigging inspected, especially swage terminals and chainplates; a rigger can do this more thoroughly with the mast down.
  • Service winches, windlass and steering gear.
  • Send the liferaft for servicing and check expiry dates of flares, extinguishers and EPIRB batteries.
  • Rebed leaking deck fittings and windows while the boat can dry out.

Interior and security

  • Open lockers and lift cushions to let air circulate; use dehumidifiers if power is available and permitted.
  • Cover hatches and ventilators to keep out dust and rain while allowing airflow.
  • Leave keys and a written job list with the marina or a trusted contractor, and agree how they will send you progress photographs.

Paperwork during the winter

  • Note when the transit log expires and whether it is cancelled by the lay-up; plan a new one with the marina agent before the spring launch.
  • Check that your insurance covers the boat ashore in Turkey and any work in progress, and inform the insurer of major works.
  • Keep invoices for all work and parts; spare parts imported for the yacht under customs control should be recorded in the yacht’s inventory, as the Blue Guide notes.
  • If you hold an EU VAT-paid status for the boat, check with your customs authority how long the yacht can stay outside the EU before that status is put at risk.
  • Track your own days in Turkey against the 90/180-day rule or your residence permit.

Choosing contractors

Most large Turkish marinas list resident firms for engines, electrics, joinery, painting, rigging and canvas, and some charge a daily fee for outside contractors. Ask the marina for a list, and ask other owners on the same pontoon for recommendations. For any significant job, agree a written specification and price, ask for the brand and product of paints and resins to be named in the quote, and agree stage payments linked to visible progress. Request dated photographs of hidden work such as laminate repairs before it is faired and painted.

For larger projects, such as osmosis treatment, an engine replacement or a teak deck, consider an independent surveyor to write the specification, inspect at key stages and sign off the work. A surveyor who works for you rather than for the yard can also help settle disagreements about scope.

A sample timeline

When Action
August to September Request winter quotes from two or three marinas using the same specification; check document validity and insurance.
Late September Sign the contract, book the lift date and contractors, reserve a storage unit.
October to November Arrive, carry out pre-haul jobs, lift out, inspect the hull, agree the job list.
December to February Structural, paint and engine work while the hull dries; receive progress photographs.
March Antifouling, anodes, polishing; return of serviced liferaft and sails.
April Launch, sea trial, new transit log if required, start of the season.

Common mistakes

  • Assuming the transit log simply continues after the owner flies home: a lay-up in a marina cancels it under the regulations, so plan for a new one.
  • Comparing storage rates without comparing the total cost of lift, wash, storage, power, launch and extra days.
  • Booking hardstand space too late; catamarans and large yachts in particular may find yards full by October.
  • Arriving with altered or handwritten registration papers, which have been rejected since August 2025.
  • Commissioning work without a written specification, then finding that the scope and price have grown.

Sources

  • Blue Guide, foreign-flagged yacht regulations: https://www.blueguide.com/what-is-the-regulations-for-foreign-flagged-yachts
  • Blue Guide, entry and exit regulations: https://2024.blueguide.com/blueguide_regulations.php
  • GocekOnline, Transitlog Turkey 2025: https://www.gocekonline.com/en/blue-cruise-guide/sailing-and-navigation/transitlog-turkey-yachts
  • Interparus, new transit log rules for yachts in Turkey (February 2026): https://interparus.com/en/new-rules-for-completing-transit-logs-in-turkey-for-yachts/
  • Setur Marinas, frequently asked questions: https://www.seturmarinas.com/en/frequently-asked-questions
  • D-Marin Didim: https://www.d-marin.com/en/marinas/didim/
  • D-Marin Göcek: https://www.d-marin.com/en/marinas/gocek/
  • D-Marin Turgutreis: https://www.d-marin.com/en/marinas/turgutreis/
  • Setur Göcek Village Port: https://www.seturmarinas.com/en/marinas/gocek-village-port
  • Setur Kuşadası Marina: https://www.seturmarinas.com/en/marinas/kusadasi
  • Setur Antalya Marina: https://www.seturmarinas.com/en/marinas/antalya
  • Milta Bodrum Marina, berthing fees: https://www.miltabodrummarina.com/ucretler-rezervasyon/denizde-baglama/
  • Hurriyet Daily News, mega yachts hauled out in Marmaris (December 2025): https://www.hurriyetdailynews.com/amp/mega-yachts-hauled-out-for-winter-maintenance-in-marmaris-216291
Share

Read next

Reader ratings

No ratings yet. Was this useful? Rate it and add what you know: corrections and first-hand tips help the next reader.

★ Rate this guide
Your rating

Stars alone are fine, and so are photos alone; a few words help even more. Reviews and bay reports go live after an automatic check that turns back adverts, contact details, insults and nonsense. The business can reply in public, but cannot edit, hide or remove a review. Sent before from this e-mail? This updates your earlier rating. Your email is never shown or shared; it keeps your reviews together in your free account. By sending you confirm it is your own first-hand experience. Privacy

Suggest a correction

One correction from you helps every sailor who opens this page after you.

An editor checks every report before anything changes on the page.

Cite this page

Wintering a yacht in Turkey: marinas, haul-out, costs, paperwork. Boat Almanac, updated 24 October 2026. https://boatalmanac.com/articles/wintering-a-yacht-in-turkey-marinas-haul-out-costs-paperwork/ (accessed 21 November 2026).

About our data

Know something other boaters should?

What you learned the hard way can spare another crew the same lesson. An editor helps polish it.

Boat Almanac is free for every sailor and grows with what sailors add.

ShareShare on WhatsApp